Darlind Construction Prefecting the Possible. Achieving the Impossible.
               COMMERCIAL
                     OC CHOPPERS
                     FW WEBB
                     IRON MOUNTAIN ODSP
                     HOLIDAY INN
                     HANNAFORD LAGRANGE
               EDUCATIONAL
                     IONA - RYAN
                     MINISINK
                     BARD - PAC
                     IONA - LA PENTA
                     IONA - HYNES
                     ST. MARTIN SCIENCE
                     AQUINAS HALL
                     BARD SCIENCE
               INDUSTRIAL
                     IBM
                     FEDEX FREIGHT BUILDING
                     BRISTOL PARK
                     DUTCHESS BEER DIST.
               MEDICAL
                     ST. LUKE'S HOSPITAL
                     NWHC
                     ST. FRANCIS HOSPITAL
                     MANKIND CORPORATION
                     BOEHRINGER INGELHEIM
               MUNICIPAL
                     GOSHEN WWTP
                     DOT - REGION 8

 

 

COMPLETED PROJECT

NORTHERN WESTCHESTER HOSPITAL

Darlind was selected as the General Contractor for the construction of the Hospital’s new Oxygen Storage Project.

The project consisted of a 14 foot high retaining wall and pad constructed into the side of a hill which serves to create a space on the tight site for the Hospital’s oxygen tanks and equipment. The area, approximately 140x30 houses the medical use oxygen for the facility.

It was necessary that the existing oxygen equipment remain in place and functional while the new supply lines, manifold, control panels, electric and controls were installed. A temporary oxygen supply was brought in for the Hospital’s use while the switch over took place.