Darlind Construction Prefecting the Possible. Achieving the Impossible.
               COMMERCIAL
                     OC CHOPPERS
                     FW WEBB
                     IRON MOUNTAIN ODSP
                     HOLIDAY INN
                     HANNAFORD LAGRANGE                      CROSS COUNTY                      ADAM'S FAIRACRE FARMS                      PRIVATE RESIDENCE
               EDUCATIONAL
                     IONA - RYAN
                     MINISINK
                     BARD - PAC
                     IONA - LA PENTA
                     IONA - HYNES
                     ST. MARTIN SCIENCE
                     AQUINAS HALL
                     BARD SCIENCE                      IONA - SPELLMAN                      LIBERTY CSD
               INDUSTRIAL
                     IBM
                     FEDEX FREIGHT BUILDING
                     BRISTOL PARK
                     DUTCHESS BEER DIST.
                     C&S WHOLESALERS
                     SCCC WIND TURBINE
                     INDIAN POINT
               MEDICAL
                     ST. LUKE'S HOSPITAL
                     NWHC
                     ST. FRANCIS HOSPITAL
                     MANKIND CORPORATION
                     BOEHRINGER INGELHEIM
                     HVH PARKING GARAGE
                     H V HOSPITAL
                     ORMC
                     HUDSON VALLEY
                     PERINATAL
               MUNICIPAL
                     GOSHEN WWTP
                     DOT - REGION 8
                     WALLKILL WTP
                     TIMBER BRIDGE
                     ROMBOUT WWTP
                     HUDSON VALLEY RAIL TRAIL
                     GRAHAMSVILLE LABORATORY
                     & OFFICES

 

 

COMPLETED PROJECT

DUTCHESS BEER DISTRIBUTORS

Darlind was selected to perform a 21,500 square foot expansion of an existing Anheuser Busch Distribution Facility on a Design/Build and Fast Track basis. The building additions are pre-engineered structures included a Controlled Environment Warehouse (CEW), Loading Docks, and a Drive-Through facility.

The project included significant earthwork and site improvements on an extremely tight site, requiring elaborate phasing and coordination to minimize disruption to the Owner's operation. The project was completed within seven months from award, including all design and required approvals.